Rotor Cabinet 100 A
Camptel line
[FINISHING CABIN – HYGIENISATION –
SANITATION – DISINFECTION]
Forced vaporization cabin
Steam Operating Temperature: 150 °C
Time-controlled work cycle in all phases.
Built-in steam generator:
– 23 Lt capacity boiler and 12 kW heating element with fully automatic operation, with water feed pump, electronic level control, safety valve and conveyed discharge.
Silent and powerful ventilator included.
WORKING CYCLE: it takes place without the slightest dispersion of steam, allowing energy savings and a better working environment.
Start of the cycle after closure of the door.
Forced vaporization by inserting, during the steaming cycle, a jet of hot air that favours the complete distribution of the steam even in the less accessible areas.
Vaporization is carried out by means of a pneumatic valve.
For correct operation, the connection to a compressed air source is necessary.
[Boiler]
Description
Other power voltage available on request
Power Voltage | V400/ph3+N+T/50hz |
Boiler capacity | 23 Lt |
Boiler heating element | 12 kW |
Blowing motor | 1 Hp – 0.75 kW |
Water pump | 0.70 Hp – 0.50 kW |
Working pressure | 5 bar |
Compressed air pressure | 6 bar |
Compressed air consumption | 6 Lt/H |
Overall dimensions | 1060x1325x2000H mm |
Weight | 250 Kg |
Additional information
Accessories | Accessories: |
---|---|
Category | Finishing and sanitation cabin |
Boiler | Built-in Boiler |